March?29,?2013?
1412?Dial?Court?
Springfield,?IL?62704?
?
Allison?Macfarlane,?Chairman?
Annette?Vietti?Cook,?Secretary?of?the?Commission?
Bill?Borchardt,?Executive?Director?for?Operations?(EDO)?
Darren?Ash,?Chief?Freedom?of?Information?Act?Officer?
United?States?Nuclear?Regulatory?Commission?
Washington,?DC?20555?0001?
?
SUBJECT:? Appeal?for?refusal?to?release?documents?requested?under?FOIA/PA?Requests?2013?0126,?
2013?0127,?and?2013?0128?
?
Dear?Dr.?Macfarlane,?Ms.?Vietti?Cook,?Mr.?Borchardt?and?Mr.?Ash:?
?
This?letter?is?an?appeal?for?FOIA/PA?2013?0126?and?FOIA/PA?2013?0127?which?is?being?submitted?in?
accordance?with?10?CFR?§9.25(j):?
?
If?the?NRC?does?not?respond?to?a?request?within?the?20?working?day?period,?or?within?the?
extended?periods?described?in?paragraph?(b)?of?this?section,?the?requester?may?treat?that?delay?
as?a?denial?of?the?request?and?immediately?appeal?as?provided?in?§?9.29(a)?or?sue?in?a?Federal?
District?Court?as?noted?in?§?9.29(c).?
?
On?Tuesday,?February?12,?2013?I?requested?five?records?from?the?NRC:?
?
? ML103490330,?Oconee?Nuclear?Site,?Units?1,?2,?and?3.??Oconee?Response?to?Confirmatory?Action?
Letter?(CAL)?2?10?003,?dated?Nov.?29,?2010?
? ML111460063,?Oconee?Nuclear?Site,?Units?1,?2,?and?3.??Response?to?Confirmatory?Action?Letter?
(CAL)?2?10?003,?dated?April?29,?2011?
? ML100780084,?Generic?Failure?Rate?Evaluation?for?Jocassee?Dam?Risk?Analysis?
? ML101610083,?Oconee?Nuclear?Station,?Units?1,?2,?and?3,???External?Flood?Commitments?
? ML101900305,?Identification?of?a?Generic?External?Flooding?Issue?Due?to?Potential?Dam?Failures?
?
My?incoming?FOIA?request?is?included?as?Enclosure?1.?
?
On?February?13,?2013?I?was?sent?an?Acknowledgement?Letter?informing?me?it?would?take?longer?than?20?
days?for?me?to?receive?my?response?and?informing?me?that?the?NRC?was?assigning?tracking?number?
2013?0126?to?my?request.??As?of?the?date?of?this?letter,?it?has?been?44?days?since?FOIA/PA?2013?0126?was?
received?by?the?NRC.??I?have?included?the?NRC’s?2013?02?13?acknowledgement?letter?to?me?as?
Enclosure?2.?
?
Please?note?that?the?records?I?have?requested?all?fall?within?the?scope?of?FOIA?2012?0128?
(ML12030A105)?which?was?submitted?by?Paul?Koberstein?on?January?27,?2012?and?received?by?the?NRC?
on?January?30,?2012.??I?have?included?Mr.?Koberstein’s?incoming?request?as?Enclosure?3?and?the?NRC’s?
acknowledgement?letter?to?him?as?Enclosure?4.??So,?although?my?FOIA?request?(2013?0126)?is?“only”?44?
days?old,?the?NRC?has?had?Mr.?Koberstein’s?request?for?425?days?and?to?my?knowledge?has?still?not?
released?all?the?requested?records.??The?only?record?of?response?that?I?can?find?to?Mr.?Koberstein’s?
January?27,?2012?request?is?a?December?4,?2012?partial?response?(ML12363A094)?which?I?have?included?
as?Enclosure?5.?
?
In?his?January?21,?2009?Memorandum?on?the?Freedom?of?Information?Act,?President?Obama?stated:?
?
In?responding?to?requests?under?the?FOIA,?executive?branch?agencies?should?act?promptly?and?in?
a?spirit?of?cooperation,?recognizing?that?such?agencies?are?servants?of?the?public.?
?
I?realize?that?the?NRC’s?FOIA?office?is?understaffed,?but?taking?44?days?to?provide?five?documents?–?for?
which?they?were?given?the?ADAMS?Accession?numbers?–?is?not?acceptable.??It?is?not?living?up?to?the?
President’s?expectation.??Additionally,?the?documents?I?requested?(two?letters?of?response?by?a?licensee?
to?a?Confirmatory?Action?Letter,?a?letter?from?a?licensee?specifying?commitments?to?address?a?significant?
safety?concern,?a?technical?evaluation?on?the?probability?of?dam?failures,?and?a?memorandum?proposing?
a?Generic?Issue?on?flooding?due?to?dam?failures)?are?documents?which?should?have?always?been?public.??
In?his?January?21,?2009?Memorandum,?President?Obama?stated:?
?
…agencies?should?take?affirmative?steps?to?make?information?public.??They?should?not?wait?for?
specific?requests?from?the?public.??All?agencies?should?use?modern?technology?to?inform?citizens?
about?what?is?known?and?done?by?their?Government.??Disclosure?should?be?timely.?
?
When?the?President?states?“what?is?known?and?done?by?their?Government”?I?am?sure?you?recognize,?as?I?
do,?that?he?would?consider?the?five?documents?requested?in?FOIA?2013?0126?to?fall?under?that?category.??
The?documents?I?requested?are?clearly?documents?which?should?have?been?made?public?without?waiting?
“for?specific?requests?from?the?public.”?
?
Of?the?records?I?have?requested,?one?(ML103490330)?has?been?released?in?ADAMS?in?response?to?
FOIA/PA?2013?0116?by?Carl?Stelzer.??Although?I?have?not?been?formally?informed?of?the?release?of?
ML103490330?by?the?NRC’s?FOIA?office,?since?I?am?now?aware?that?it?is?publicly?available?in?ADAMS,?I?
can?consider?it?as?provided?under?FOIA?2013?0126?and?do?not?need?a?hardcopy?sent?to?me.?
?
I?am?still?awaiting?the?release?of?the?following?documents:?
?
? ML111460063?
? ML100780084?
? ML101610083?
? ML101900305?
A?redacted?version?of?ML100780084?(ML13039A084)?was?released?in?ADAMS?in?response?to?FOIA/PA?
2013?0110?by?Paul?Blanch,?a?redacted?version?of?ML101610083?(ML13051A896)?was?released?in?ADAMS?
in?response?to?FOIA/PA?2013?0113?by?Joe?Carson,?and?a?redacted?version?of?ML101900305?
(ML13039A086)?was?released?in?ADAMS?in?response?to?FOIA/PA?2013?0133?by?Kay?Drey.?
?
I?do?not?agree?with?the?redactions?the?NRC’s?Office?of?Nuclear?Reactor?Regulation?(NRR)?applied?to?the?
documents?released?to?Mr.?Blanch,?Mr.?Carson?and?Ms.?Drey.??I?believe?NRR?is?abusing?the?scope?of?FOIA?
Exemption?7(F).??FOIA?Exemption?7(F)?is?meant?to?protect?law?enforcement?informants.??By?broadly?
categorizing?protection?against?sabotage?as?falling?under?Exemption?7(F),?NRR?is?bypassing?the?legislative?
checks?and?balances?which?were?meant?to?occur?as?part?of?the?Freedom?of?Information?Act.??There?is?a?
process?for?redacting?information?which?the?NRC?believes?is?useful?to?saboteurs.??That?process?is?to?mark?
2
the?documents?as?classified?materials?or?as?Safeguards.??If?neither?of?these?designations?legitimately?
applies,?then?the?process?is?to?go?to?the?US?Congress?and?ask?for?a?new?statutory?designation?for?which?
NRR?can?use?FOIA?Exemption?3.??Abusing?Exemption?7(F)?is?not?what?the?President?expects?NRR?to?do:??
?
The?Freedom?of?Information?Act?should?be?administered?with?a?clear?presumption:??In?the?face?of?
doubt,?openness?prevails.??The?Government?should?not?keep?information?confidential?merely?
because?public?officials?might?be?embarrassed?by?disclosure,?because?errors?and?failures?might?
be?revealed,?or?because?of?speculative?or?abstract?fears.?
?
I?recognize?that?the?way?we?have?handled?the?Jocassee/Oconee?issue?is?embarrassing.???I?recognize?that?
it?is?embarrassing?for?us?to?admit?that?the?original?licensing?for?Oconee?Station?failed?to?take?into?
account?the?probability?of?flooding?due?to?a?failure?of?Jocassee?Dam.??I?recognize?it?is?embarrassing?for?us?
to?admit?that?the?flood?wall?around?Oconee?is?undersized?and?we?have?known?about?it?since?early?1994?
yet?have?not?been?able?to?get?Duke?Energy?to?correct?it.??I?recognize?that?it?is?embarrassing?that?it?took?
over?two?years?to?route?an?Information?Notice?and?a?Generic?Issue?on?flooding?due?to?upstream?dam?
failures.??But,?as?the?President?stated,?“The?Government?should?not?keep?information?confidential?merely?
because?public?officials?might?be?embarrassed?by?disclosure,?because?errors?and?failures?might?be?
revealed,?or?because?of?speculative?or?abstract?fears.”?
?
With?regard?to?“speculative?or?abstract?fears”,?withholding?from?the?public?–?for?over?six?years?–?the?
significant?safety?liability?which?Jocassee?Dam?poses?to?the?three?reactors?at?Oconee?Nuclear?Station?
because?of?vague?concerns?about?terrorism?and?sabotage?is?giving?into?“speculative?or?abstract?fears”.??
None?of?the?information?redacted?from?the?documents?provided?to?Mr.?Blanch,?Mr.?Carson?and?Ms.?Drey?
contain?any?reference?to?security?matters.??The?weak?points?in?the?dam’s?construction?–?if?there?are?any?
–?are?not?revealed.??The?physical?security?of?the?dam?–?if?there?is?any?–?is?not?discussed.??All?that?is?
revealed?by?the?redacted?material?is?the?severe?SAFETY?liability?posed?to?the?public?by?a?failure?of?
Jocassee?Dam.???It?is?the?President’s?expectation?that?“In?the?face?of?doubt,?openness?prevails”.??I?have?
much?doubt?about?NRR’s?speculative?and?abstract?fears?regarding?sabotage?of?Jocassee?Dam?and?I?
expect?openness?to?prevail.??Maybe?there?is?a?legitimate?security?threat?to?Jocassee?Dam,?but?the?
information?redacted?from?the?documents?does?nothing?to?make?that?security?threat?worse?yet?it?does?
plenty?to?keep?the?public?from?being?informed?“about?what?is?known?and?done?by?their?Government.”?
?
I?expect?to?receive?unredacted?versions?of?ML100780084,?ML101610083,?and?ML101900305?as?part?of?
FOIA/PA?request?2013?0126.??If?the?NRC?does?not?intend?to?send?me?unredacted?versions?of?these?three?
documents?and?if?the?NRC?instead?intends?to?provide?me?the?redacted?versions?which?were?provided?to?
Mr.?Blanch,?Mr.?Carson?and?Ms.?Drey,?then?I?expect?you?to?formally?tell?me?in?a?FOIA?response?so?that?I?
can?pursue?the?release?of?the?requested?documents?in?accordance?with?10?CFR?§2.29(c).?
?
Also,?I?expect?to?receive?an?unredacted?version?of?ML111460063?which?to?my?knowledge?has?never?been?
publicly?released?by?the?NRC?in?either?an?unredacted?or?a?redacted?form?since?being?requested?by?Paul?
Koberstein?425?days?ago,?since?being?requested?by?Jim?Riccio?191?days?ago?(ML12263A087),?and?since?
being?requested?by?me?45?days?ago.??I?have?included?Mr.?Riccio’s?request?as?Enclosure?6.?
?
I?recognize?that,?to?the?NRC,?Paul?Koberstein’s?and?Jim?Riccio’s?requests?might?seem?daunting?–?
especially?given?that?emails?fall?under?the?documents?they?seek?–?but?to?delay?formal?correspondence?
between?the?NRC?and?a?licensee?for?425?days?and?191?days?respectively?is?unsatisfactory.??The?NRC?
should?release?ALL?correspondence?with?licensees?prior?to?getting?a?FOIA?request?for?it.??If?parts?of?the?
correspondence?must?be?withheld,?then?it?should?be?redacted?–?but?a?few?sensitive?sentences?should?
3
not?cause?an?entire?piece?of?correspondence?to?be?withheld.??That?is?what?the?Attorney?General?alludes?
to?in?his?March?19,?2009?Memorandum:?
?
“…agencies?should?readily?and?systematically?post?information?online?in?advance?of?any?public?
request.??Providing?more?information?online?reduces?the?need?for?individualized?requests?and?
may?help?reduce?existing?backlogs.??When?information?not?previously?disclosed?is?requested,?
agencies?should?make?it?a?priority?to?respond?in?a?timely?manner.??Timely?disclosure?of?
information?is?an?essential?component?of?transparency.??Long?delays?should?not?be?viewed?as?an?
inevitable?and?insurmountable?consequence?of?high?demand.”??
?
I?have?included?the?President’s?memo?as?Enclosure?7?and?the?Attorney?General’s?memo?as?Enclosure?8?
since,?apparently,?there?are?some?offices?within?the?NRC?that?didn’t?get?the?memo.?
?
Also?enclosed?with?this?letter?(Enclosure?9)?is?a?five?page?list?of?documents?relating?to?the?flooding?
hazard?which?Jocassee?Dam?poses?to?the?three?reactors?at?the?Oconee?Nuclear?Station.??This?list?was?
originally?included?in?a?2012?10?15?letter?to?the?Senate?Committee?on?Homeland?Security?&?
Governmental?Affairs?and?in?a?2012?11?14?letter?to?the?Senate?Committee?on?the?Environment?&?Public?
Works.??There?are?101?documents?listed?on?Enclosure?9.??On?the?list?I?highlighted?thirteen?documents?
which?were?originally?stamped?“Official?Use?Only?–?Security?Related?Information”?or?some?similar?
designation?which?prevented?them?from?being?shared?with?the?public.??All?thirteen?of?these?documents?
were?released?under?the?Freedom?of?Information?Act?with?no?redactions,?which?brings?into?question?why?
they?were?originally?stamped?as?needing?to?be?withheld?from?the?public.??Was?it?“because?public?officials?
might?be?embarrassed?by?disclosure”???Was?it?“because?errors?and?failures?might?be?revealed”???Or?was?it?
“because?of?speculative?or?abstract?fears”???
?
Also?contained?on?Enclosure?9?are?fifteen?documents?which?were?marked?“Official?Use?Only?–?Security?
Related?Information”?but?have?since?been?released?with?redactions?claiming?Exemption?7(F).?Even?if?the?
redactions?implemented?in?response?to?FOIA?Exemption?7(F)?were?in?fact?necessary,?under?the?
President’s?and?Attorney?General’s?guidance?these?documents?should?have?still?been?voluntarily?shared?
in?a?redacted?form?prior?to?the?submittal?of?a?FOIA?request.??Additionally,?there?are?six?documents?listed?
which?I?could?not?find?electronically,?and?sixty?documents?which?are?internally?in?ADAMS?but,?despite?
Mr.?Koberstein’s?and?Mr.?Riccio’s?requests,?are?still?non?public.??Note?that?these?non?public?documents?
consist?of?formal?correspondence?between?the?NRC?and?a?licensee?on?a?significant?safety?concern,?
internal?NRC?formal?memos,?internal?NRC?analysis?reports,?Power?Point?presentations,?etc.??It?is?my?
position?that?we?should?not?wait?for?Freedom?of?Information?Act?requests?to?release?these?documents;?
we?should?follow?the?President’s?and?Attorney?General’s?guidance?and?take?“affirmative?steps?to?make?
information?public”?by?posting?these?documents?“online?in?advance?of?any?public?request”?in?order?to?
“use?modern?technology?to?inform?citizens?about?what?is?known?and?done?by?their?Government”.?
?
It?is?impossible?for?the?public?to?ask?for?documents?on?an?issue?when?they?do?not?even?know?that?the?
issue?exists.??By?designating?the?flooding?hazard?posed?by?Jocassee?Dam?as?“Security?Related?
Information”,?the?Office?of?Nuclear?Reactor?Regulation?(NRR)?was?able?to?successfully?keep?this?issue?
from?public?scrutiny?for?over?five?years?–?until?the?March?2012?public?release?of?the?highly?redacted?
screening?report?for?GI?204?by?the?Office?of?Nuclear?Regulatory?Research?(RES)?brought?this?issue?to?the?
attention?of?intervener?groups.??Once?these?groups?realized?this?issue?existed,?they?desired?information?
on?it.??Was?it?right?for?the?NRC?to?keep?this?important?safety?concern?from?the?public?for?so?long???Is?that?
what?President?Obama?expects?of?us???I?do?not?profess?to?be?able?to?read?the?President’s?mind.??But?I?do?
profess?to?be?able?to?read?and?understand?English.??And?the?memo?the?President?released?on?his?
4
inauguration?day?regarding?the?Freedom?of?Information?Act?is?very?concisely?and?clearly?written?in?plain?
English.??The?President?expects?Open?Government.??If?there?is?truly?a?security?concern?with?some?of?the?
information?regarding?the?Jocassee/Oconee?issue,?then?the?President?expects?us?to?specifically?withhold?
those?pieces?of?sensitive?information?that?might?enable?terrorists?to?defeat?our?security?defenses.??But?I?
do?not?believe?the?President?expected?us?to?withhold,?in?its?entirety,?a?significant?safety?issue?from?the?
American?people?for?over?half?a?decade.??
?
In?addition?to?the?five?documents?requested?under?FOIA?2013?0126,?on?Tuesday,?February?12,?2013?I?
also?requested?the?following?documents:?
?
? A?2012?09?18?email?which?I?had?sent?to?NRC?Chairman?Allison?Macfarlane,?US?Special?Counsel?
Carolyn?Lerner,?NRC?Inspector?General?Hubert?Bell,?Deputy?Inspector?General?David?Lee,?NRC?
General?Counsel?Marian?Zobler,?and?NRC?Nuclear?Security?and?Incident?Response?Office?Director?
Jim?Wiggins?(the?subject?of?the?email?was?“Inadequately?Sized?Flood?Wall?at?Oconee?Nuclear?
Station?Could?Lead?to?Fukushima?Scenario?in?the?Event?of?a?Failure?of?the?Lake?Jocassee?Dam”)?
? A?letter?dated?2012?09?18?to?NRC?Chairman?Macfarlane?which?was?attached?to?the?email?
mentioned?above?(the?email?attachment?containing?the?letter?was?entitled?“Jocassee?Dam?
Failure?Concerns.pdf”)?
?
My?incoming?FOIA?request?is?included?as?Enclosure?10.?
?
On?February?13,?2013?I?was?sent?an?Acknowledgement?Letter?informing?me?it?would?take?longer?than?20?
days?for?me?to?receive?my?response?and?informing?me?that?the?NRC?was?assigning?tracking?number?
2013?0127?to?my?request.??As?of?the?date?of?this?letter,?it?has?been?44?days?since?FOIA/PA?2013?0127?was?
received?by?the?NRC.??I?have?included?the?NRC’s?2013?02?13?acknowledgement?letter?to?me?as?
Enclosure?11.?
?
I?was?hoping?my?2012?09?18?letter?to?the?NRC?Chairman?would?lead?to?a?discussion?on?the?way?the?
agency?has?handled?concerns?regarding?flood?protection?at?the?Oconee?Nuclear?Station,?not?just?from?a?
safety?and?security?perspective?but?also?from?the?perspective?of?transparency?and?Open?Government.??
Instead,?the?only?response?that?I?received?from?the?Chairman’s?office?was?an?email?from?her?legal?
counsel?informing?me?that?the?Chairman?had?referred?my?letter?to?the?Inspector?General.??On?
January?17,?2013?I?met?with?two?Special?Agents?from?the?NRC’s?Office?of?the?Inspector?General?who?
interrogated?me?under?oath?for?several?hours?to?assess?whether?there?exists?adequate?evidence?to?indict?
me?with?a?federal?felony1?for?including?in?my?letter?to?the?Chairman?information?which?I?had?obtained?
from?accessing?the?NRC’s?internal?Agencywide?Document?Access?and?Management?System?(ADAMS)?and?
for?failing?to?designate?my?letter?as?“Official?Use?Only?–?Security?Related?Information”.??This?criminal?
investigation?is?occurring?even?though:?
?
? My?2012?09?18?letter?was?not?sent?outside?the?federal?government.??All?the?people?to?whom?I?
sent?it?were?either?NRC?employees,?Congressional?staffers,?or?the?US?Special?Counsel.??As?a?
licensed?Professional?Engineer?and?as?a?federal?servant?it?is?my?belief?that?I?have?a?duty?(as?well?
as?a?right2)?to?report?to?Congressional?oversight?committees?when?I?do?not?believe?the?
????????????????????????????????????????????????????????????
1?18?USC?§1030,?The?Computer?Fraud?and?Abuse?Act?of?1984?as?modified?by?the?USA?PATRIOT?Act?
2?The?Lloyd?LaFollette?Act?of?1912?was?codified?as?5?USC?§7211?–?Employees’?right?to?petition?Congress:??The?right?
of?employees?…?to?furnish?information?to?either?House?of?Congress,?or?to?a?committee?or?Member?thereof,?may?not?
be?interfered?with?or?denied.??
5
management?at?my?agency?is?adequately?addressing?significant?safety?concerns?despite?being?
internally?forewarned?of?shortcomings?for?several?years.3?
? None?of?the?information?contained?in?the?letter?was?classified?as?Restricted?Data?or?Formerly?
Restricted?Data?(42?USC?§2161?2165)?nor?was?any?of?it?designated?as?Unclassified?Safeguards?
Information?(43?USC?§2167).?
? Although?some?of?the?documents?were?marked?as?“Official?Use?Only?–?Security?Related?
Information”,?according?to?the?NRC’s?FOIA?office?this?marking?is?“an?unofficial?administrative?
marking?that?has?no?legal?import”?and?is?“not?indicia?of?any?national?security?classification”?(see?
Enclosure?12).??Furthermore,?the?“Official?Use?Only?–?Security?Related?Information”?documents?
from?which?I?quoted?were?not?portion?marked?and?therefore?it?is?impossible?to?tell?what?parts?of?
the?documents?were?considered?non?public?by?the?NRR?personnel?who?marked?the?documents.??
From?my?reading?of?the?relevant?guidance?(10?CFR?§2.3904,?NRC?MD?12.6,5?SECY?04?0191,6?a?
policy?statement,7?and?several?conflicting8?announcements?posted?on?internal?NRC?intranet?
pages)?it?is?my?assessment?that?the?material?contained?in?my?letter?to?the?Chairman?is?nothing?
the?NRC?is?required?to?withhold?from?the?public.?
?
On?October?9,?2012?Dave?Lochbaum?of?the?Union?of?Concerned?Scientists?requested?my?2012?09?18?
letter?to?the?NRC?Chairman.??Mr.?Lochbaum’s?request?was?registered?by?the?NRC?as?FOIA?2013?0008?
(ML12283A329).??It?is?included?as?Enclosure?13.??On?October?15,?2012?Tom?Zeller?of?the?Huffington?Post?
requested?my?2012?09?18?letter?to?the?NRC?Chairman.??Mr.?Zeller’s?request?was?registered?by?the?NRC?as?
FOIA?2013?0013?(ML12290A070).??It?is?included?as?Enclosure?14.??Mr.?Zeller?also?requested?“expedited?
processing”?for?his?request.?
????????????????????????????????????????????????????????????
3?There?are?some?who?have?told?me?my?first?duty?is?to?attempt?to?internally?address?my?concerns?through?my?chain?
of?command.??However,?there?are?plenty?of?technical?experts?within?NRR?who?had?been?attempting?to?internally?
address?this?concern?for?several?years?(e.g.?Melanie?Galloway,?Jeff?Mitman,?Fernando?Ferrante).??I?failed?to?see?how?
I?could?have?internally?prevailed?where?they?had?not?and?chose?instead?to?appeal?to?the?Chairman?and?our?
Congressional?oversight.??It?has?been?my?experience?from?other?issues?(e.g.?the?2003?10?21?unrecognized?passive?
reactor?shutdown?at?Callaway?Plant)?that?the?NRC’s?internal?concerns?resolution?processes?do?not?function?
adequately,?and?those?processes?had?already?been?unsuccessfully?used?by?NRR?personnel?attempting?to?address?
this?issue?(e.g.?ML091170104?–?Galloway’s?non?public?NCP?form,?ML110260443?–?Mitman’s?non?public?NCP?form).??
4?10?CFR?§2.390,?Public?inspection,?exemptions,?requests?for?withholding.?
5?Management?Directive?12.6,?NRC?Sensitive?Unclassified?Information?Security?Program?(ML041700603)?
6?SECY?04?0191,?Withholding?Sensitive?Unclassified?Information?Concerning?Nuclear?Power?Reactors?from?Public?
Disclosure?(ML042310663)?
7?NRC?Policy?for?Handling,?Marking,?and?Protecting?Sensitive?Unclassified?Non?Safeguards?Information?
(ML052990146)?
8?On?October?26,?2012?I?wrote?an?8?page?email?to?my?union?representation?advising?them?of?the?poor?condition?of?
the?guidance?for?Official?Use?Only?information.??Management?Directive?12.6?is?from?1999?(i.e.?two?years?prior?to?
the?drastic?information?handling?changes?resulting?from?the?2001?09?11?attacks)?and?is?woefully?out?of?date?as?
evidenced?by?the?need?to?sort?through?conflicting?guidance?in?SECY?papers,?policy?statements?and?intranet?
announcements?to?resolve?significant?questions.??I?also?wrote?a?two?page?email?on?October?25,?2012?to?NRC?
Facilities?Security?(the?program?owner?for?MD?12.6)?detailing?some?of?this?conflicting?guidance.??Both?these?emails?
were?captured?in?internal?NRC?ADAMS?as?ML12313A059.??These?emails?had?been?meant?to?point?out?a?problem?in?
the?hopes?of?reaching?a?dialogue?to?produce?solutions;?they?were?not?merely?meant?to?be?finger?pointing.??
However,?thus?far?no?dialogue?has?ensued?and?instead?the?NRC?has?labeled?ML12313A059?as?“Allegation?Material”.??
As?typical?of?the?so?called?“allegations”?which?others?have?submitted?to?the?Inspector?General?in?my?name,?no?one?
investigating?it?has?yet?engaged?me?to?discuss?it.??Since?my?Office?Director?and?my?Union?President?have?been?
unreceptive?to?my?concerns,?I?do?not?expect?you?to?engage?me?to?address?them?either.??But?if?anyone?is?interested,?
my?concerns?regarding?the?marking?and?handling?of?SUNSI?are?provided?in?ML12313A059.?
6
?
Admittedly,?my?2012?09?18?letter?to?Dr.?Macfarlane?was?long?(19?pages?plus?a?two?page?enclosure).??But?
the?NRC?has?had?my?request?for?45?days,?Mr.?Zeller’s?“expedited?processing”?request?for?134?days,?and?
Mr.?Lochbaum’s?request?for?140?days.??It?is?ludicrous?that?it?would?take?140?days?for?the?NRC?to?
determine?what?parts?of?my?2012?09?18?letter?can?be?released?to?the?American?public.??Hopefully?you?
recognize,?as?I?do,?that?taking?140?days?to?respond?to?FOIA?2013?0008?is?not?living?up?to?the?President’s?
and?Attorney?General’s?ideals?of?Open?Government:??“When?information?not?previously?disclosed?is?
requested,?agencies?should?make?it?a?priority?to?respond?in?a?timely?manner.??Timely?disclosure?of?
information?is?an?essential?component?of?transparency.??Long?delays?should?not?be?viewed?as?an?
inevitable?and?insurmountable?consequence?of?high?demand.”???
?
I?ask?that?you?consider?the?Attorney?General’s?memo?and,?with?regard?to?my,?Mr.?Lochbaum’s?and?Mr.?
Zeller’s?requests,?“make?it?a?priority?to?respond?in?a?timely?manner”.??And?please?remember:?
?
The?Freedom?of?Information?Act?should?be?administered?with?a?clear?presumption:??In?the?face?of?
doubt,?openness?prevails.??The?Government?should?not?keep?information?confidential?merely?
because?public?officials?might?be?embarrassed?by?disclosure,?because?errors?and?failures?might?
be?revealed,?or?because?of?speculative?or?abstract?fears.?
?
I?also?made?a?third?request?under?the?Freedom?of?Information?Act?on?February?12,?2013:?
?
ML091170104,?Oconee?Nuclear?Station,?Units?1,?2?And?3?–?Non?concurrence?on?Evaluation?of?
Duke?Energy?Carolinas,?LLC?September?26,?2008,?Response?to?Nuclear?Regulatory?Commission?
Letter?Dated?August?15,?2008?Related?to?External?Flooding?
?
I?have?included?this?request?as?Enclosure?15.??On?February?13,?2013?the?NRC?recorded?this?request?as?
FOIA?2013?0128;?I?have?included?the?NRC’s?acknowledgement?letter?as?Enclosure?16.?
?
Ms.?Galloway’s?Non?Concurrence?Form?falls?within?the?scope?of?both?Paul?Koberstein’s?January?27,?2012?
request?and?Jim?Riccio’s?September?18,?2012?request.??So,?although?I?have?“only”?been?waiting?45?days,?
Mr.?Koberstein?has?been?waiting?425?days?and?Mr.?Riccio?191?days?–?for?a?19?page?document.?
?
Most?of?Ms.?Galloway’s?Non?Concurrence?Form?is?stamped?“Official?Use?Only?–?Security?Related?
Information”?despite?not?addressing?any?security?related?topics.??Everything?in?her?Non?Concurrence?is?a?
safety?concern,?not?a?security?concern.?
?
On?page?17?of?her?Non?Concurrence?Form,?it?is?denoted?that?Ms.?Galloway?“Wants?NCP?Form?Non?
Public”.??It?is?unclear?why?this?block?was?checked.??Was?it?checked?because?in?April?2009?Ms.?Galloway?
was?embarrassed?by?having?the?fortitude?and?independence?to,?without?the?benefit?of?the?example?of?
the?Fukushima?Dai?ichi?accident?(this?was?two?years?prior?to?that?flooding?induced?accident),?stand?apart?
from?the?rest?of?her?management?in?NRR?and?insist?that?the?flood?risks?posed?by?Jocassee?Dam?to?the?
reactors?at?Oconee?was?a?credible?threat?that?needed?to?be?rigorously?vetted?and?addressed???Or?was?it?
checked?because?Ms.?Galloway?was?aware?of?NRR’s?designation?of?this?topic?as?a?“Security?Related”?
issue?and?so,?as?part?of?the?NRR?management?team?(she?was?a?Deputy?Division?Director),?felt?she?could?
not?check?the?block?for?“Wants?NCP?Form?Public”?because?that?could?imply?she?was?disagreeing?with?the?
“Security?Related”?designation?of?the?Jocassee/Oconee?issue???These?are?not?rhetorical?questions.??
These?are?questions?you?need?to?answer?as?part?of?processing?this?appeal.??Why?is?the?Non?Concurrence?
Form?of?a?Deputy?Division?Director?on?a?letter?to?a?licensee?concerning?a?serious?safety?issue?–?yet?
7
containing?no?discussion?of?security?vulnerabilities?–?being?withheld?from?the?public???Is?it?“because?
public?officials?might?be?embarrassed?by?disclosure”???Is?it?“because?errors?and?failures?might?be?
revealed”???Or?is?it?“because?of?speculative?or?abstract?fears”??
?
Again,?this?is?an?appeal?of?a?de?facto?decision?by?the?NRC?to?withhold?from?release?the?following?
documents:?
?
1. ML111460063,?which?was?requested?under?FOIA?2013?0126?
2. ML100780084,?which?was?requested?under?FOIA?2013?0126?
3. ML101610083,?which?was?requested?under?FOIA?2013?0126?
4. ML101900305,?which?was?requested?under?FOIA?2013?0126?
5. my?2012?09?18?email?to?the?NRC?Chairman,?which?was?requested?under?FOIA?2013?0127?
6. my?2012?09?18?letter?to?the?NRC?Chairman,?which?was?requested?under?FOIA?2013?0127?
7. ML091170104,?which?was?requested?under?FOIA?2013?0128?
?
If?I?do?not?receive?unredacted?versions?of?these?seven?requested?documents?by?May?13,?2013,?then?I?
intend?to?continue?the?appeal?process?in?accordance?with?10?CFR?§9.29(c).??So?please?conform?to?the?
President’s?and?Attorney?General’s?desires—for?the?clear?presumption?of?openness?prevailing?in?the?face?
of?doubt?and?for?the?timely?processing?of?FOIA?requests/appeals—by?immediately?releasing?the?
documents?I?have?requested.?
?
Although?I?live?in?Springfield,?IL,?I?work?in?Rockville,?MD.??Please?do?not?send?documents?to?my?home?in?
Springfield,?IL?as?I?will?not?get?them?in?a?timely?manner.??Please?send?all?written?correspondence?to?me?
[email protected]??If?your?processes?will?not?allow?you?to?do?this,?then?please?
contact?me?via?phone?or?email?and?I?will?come?by?the?FOIA?desk?to?pick?up?the?correspondence.?
?
Very?respectfully,?
?
Lawrence?S.?Criscione,?PE?
(573)?230?3959?
?
Enclosures?(16)?
?
Cc:? Billie?Garde,?Esq.,?Clifford?&?Garde?
Louis?Clark,?The?Government?Accountability?Project?
Paul?Koberstein,?Cascadia?Times?
Kay?Drey,?Beyond?Nuclear?
Carl?Stelzer,?reporter?
Paul?Blanch,?consultant?
Joe?Carson,?Affiliation?of?Christian?Engineers?
Jim?Riccio,?Greenpeace?
David?Lochbaum,?Union?of?Concerned?Scientists?
Tom?Zeller,?Huffington?Post?
?
??
A?major?flaw?in?our?system?of?government,?and?even?in?industry,?is?the?latitude?to?do?less?than?is?necessary.??Too?
often?officials?are?willing?to?accept?and?adapt?to?situations?they?know?to?be?wrong.??The?tendency?is?to?downplay?
problems?instead?of?actively?trying?to?correct?them.????? ? ? ? –Admiral?Rickover,?1982?
8
(b)(6)
(b)(6) (b)(6)
(b)(6)
(b)(6)
(b)(6)
??????????????????????????????????????????????????????????????
February 13, 2013
FOIA/PA-2013-00126
Lawrence Criscione
1412 Dial Court
Springfield, IL 62704
Dear Requester:
We received your Freedom of Information Act/Privacy Act (FOIA/PA) request on February 13,
2013.
Your request has been assigned the following reference number that you should use in any
future communications with us about your request: FOIA/PA-2013-00126
To ensure the most equitable treatment possible of all requesters, the NRC processes requests
on a first-in, first-out basis, using a multiple track system based upon the estimated time it will
take to process the request. Based on your description of the records you are seeking, we
estimate completion of your request will be over 20 working days. We will advise you of any
change in the estimated time to complete your request.
Due to the unexpected events in Japan in March 2011, the NRC is processing a larger than
normal volume of FOIA requests including some that have qualified for expedited processing
and have therefore been placed at the front of the queue. We are doing our best to process all
requests in a timely manner but our response times are being affected. We appreciate your
understanding.
For purposes of assessing fees in accordance with our regulations (10 CFR 9.33), we have
placed your request in the following category: Non-Excepted. If applicable, you will be charged
appropriate fees for: Search and Duplication of Records.
A sheet has been enclosed that explains in detail the fee charges that may be applicable.
Please do not submit any payment unless we notify you to do so.
The following person is the FOIA/PA Specialist who has been assigned responsibility for your
request: Linda Kilgore at 301-415-5775.
If you have questions on any matters concerning your FOIA/PA request please feel free to
contact the assigned FOIA/PA Specialist or me at (301) 415-7169.
Sincerely,
/S/
Donna L. Sealing
FOIA/Privacy Act Officer
Office of Information Services
Enclosures:
Incoming Request
Explanation of Fees
UNITED STATES
NUCLEAR REGULATORY COMMISSION
WASHINGTON, D.C. 20555-0001
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
January 30, 2012
FOIA/PA-2012-00128
Paul Koberstein
Cascadia Times
4037 N. Overlook Terrace
Portland, OR 97227
Dear Requester:
We received your Freedom of Information Act/Privacy Act (FOIA/PA) request on January 30,
2012.
Your request has been assigned the following reference number that you should use in any
future communications with us about your request: FOIA/PA-2012-00128
To ensure the most equitable treatment possible of all requesters, the NRC processes requests
on a first-in, first-out basis, using a multiple track system based upon the estimated time it will
take to process the request. Based on your description of the records you are seeking, we
estimate completion of your request will be over 20 working days. We will advise you of any
change in the estimated time to complete your request.
Due to the unexpected events in Japan, the NRC is experiencing a larger than normal volume of
FOIA requests including some that have qualified for expedited processing and have therefore
been placed at the front of the queue. We are doing our best to process all requests in a timely
manner but our response times are being affected. We appreciate your understanding.
For purposes of assessing fees in accordance with our regulations (10 CFR 9.33), we have
placed your request in the following category: News Media Representative. If applicable, you
will be charged appropriate fees for: Duplication Only.
A sheet has been enclosed that explains in detail the fee charges that may be applicable.
Please do not submit any payment unless we notify you to do so.
The following person is the FOIA/PA Specialist who has been assigned responsibility for your
request: Linda Kilgore at 301-415-5775.
If you have questions on any matters concerning your FOIA/PA request please feel free to
contact the assigned FOIA/PA Specialist or me at (301) 415-7169.
Sincerely,
/S/
Donna L. Sealing
FOIA/Privacy Act Officer
Office of Information Services
Enclosures:
Incoming Request
Explanation of Fees
UNITED STATES
NUCLEAR REGULATORY COMMISSION
WASHINGTON, D.C. 20555-0001
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
??????????????????????????????????????????????????????????????
Date ADAMS Title
1994FEB11 LetterfromAlbertF.Gibson,NRC,toJ.W.Hampton,Duke,”NoticeofViolationand
NoticeofDeviation(NRCInspectionReportNos.50269/9325,50270/9325,and
50287/9325),”datedFebruary11,1994
1994MAR14 LetterfromJ.W.Hampton,Duke,datedMarch14,1994
1994OCT6 InternalNRCmemodocumentingameetingbetweenRegionIIandNRRconcerning
ahypotheticalJocasseeDamfailure.
1994DEC19 LetterfromAlbertF.Gibson,NRC,toJ.W.Hampton,Duke,”NoticeofViolationand
NoticeofDeviation(NRCInspectionReportNos.50269/9431,50270/9431,and
50287/9431),”datedDecember19,1994
2000MAR15 LetterfromDavidE.LaBarge,NRC,toW.R.McCollum,Jr.,”OconeeNuclearStation,
Units1,2,and3Re:ReviewofIndividualPlantExaminationofExternalEvents(TAC
Nos.M83649,M83650,andM83651),”datedMarch15,2000
2006APR28 ML061180451 OCONEENUCLEARSTATIONINTEGRATEDINSPECTIONREPORT
O5000269/2006002,05000270/200602,05000287/2006002
2006AUG31 ML080780143 IR0500026906016,IR0500027006016,IR0500028706016,on03/31/2006,
OconeeNuclearStationPreliminaryWhiteFinding
2006OCT5 ML062890206 Oconee,Units1,2&3ResponsetoPreliminaryWhiteFinding
2006NOV22 ML063260282 IR0500026906017,IR0500027006017,IR0500028706017,FinalSignificance
DeterminationforaWhiteFindingandNoticeofViolation,DukeEnergyCarolinas,
LLC
2006DEC20 ML063620092 Oconee,Units1,2,&3,AppealofFinalSignificanceDeterminationforWhite
FindingandReplytoNoticeofViolation;EA06199
2007JAN29 ML070440345 SummaryofRevisedFragilityEvaluationResultsforJocasseeDam
2007FEB5 LetterfromBruceH.Hamilton,Duke,toNRC,”SeismicFragilityStudy”
2007FEB22 ML070590329 ManualChapter0609.02AppealPanelRecommendations(OconeeReplytoa
NoticeofViolationandWhiteFinding(EA06199))
2007MAR1 ML070610460 OconeeAppealPanelReviewofManualChapter0609.02AppealPanelReviewof
OconeeStandbyShutdownFacilityWhiteFinding(EA06199)
2007MAY3 ML072970510 Oconee,Units1,2and3RequestforNRCtoReviewAppealofFinalSignificance
DeterminationforSSFFloodBarrierWhiteFinding
2007JUN22 ML071580259 ConsiderationofNewInformationAssociatedwithaFinalSignificance
DeterminationforaWhiteFindingOconeeNS
2007JUN28 PhonecallbetweentheNRCandDukeEnergy
2007OCT1 ML072770765 10/01/2007,SlideswithNotesforFinalRegulatoryAssessmentofOconeeFlood
BarrierIssue
2007OCT1 ML072770775 DamFailureInformation
2007OCT1 ML072770777 QuestionsandAnswersRelatedtoOconeeFloodBarrier
2007NOV20 ML073241045 ReconsiderationofFinalSignificanceDeterminationAssociatedwithStandby
ShutdownOconeeFacilityFloodBarrierWhiteFinding
2008MAY19 ML081350689 BriefingPackageForDropInVisitByDukeEnergyChiefNuclearOfficerWith
ChairmanKleinAndCommissionerJaczkoOnMay21,2008
2008JUN23 ML082390669 ProposalforaRiskAnalysisoftheFailureoftheJocasseeandKeoweeDamsto
AssessthePotentialEffectsontheSafeShutDownFacilityoftheOconeeNuclear
Station,SouthCarolina
2008JUL28 ML082120390 OconeeNuclearStationRevisionstotheSelectedLicenseeCommitmentsManual
(SLC)

 






 





Enclosure 9 of FOIA Appeal for Requests 2013-0126, 0127 & 0128
Date ADAMS Title
2008AUG15 ML081640244 InformationRequestPursuantto10CFR50.54(F)RelatedtoExternalFlooding,
IncludingFailureoftheJocasseeDamatOconeeNuclearStation,Units1,2,and3
(TACNos.MD8224,MD8225,andMD8226)
2008AUG26 ML082390690 KickOffforRiskAnalysisoftheFailureoftheJocasseeandKeoweeDamstoAssess

thePotentialEffectsontheSafeShutdownFacilityattheOconeeNuclearStation
2008AUG28 ML083300427 08/28/2008SummaryofClosedMeetingtowithDukeEnergyCarolinas,LLCto
DiscusstheAugust15,2008,50.54(f)LetteronExternalFlooding(TACNos.
MD8224,MD8225,andMD8226)
2008AUG28 ML082550290 MeetingwithDukeEnergyCarolinas,OconeeFloodProtectionandtheJocassee
DamHazard
2008SEP6 ML082250166 OconeeNuclearStationCommunicationPlanforInformationRequestRelatedto
FailureFrequenciesfortheJocasseePumpedStorageDam(JocasseeDam)atthe
OconeeNuclearStationandPotentialGenericImplications
2008SEP26 ML082750106 Oconee,Units1,2and3Responseto10CFR50.54(f)Request
2008NOV5 ML091060761 11/05/08SummaryofClosedMeetingwithDukeonExternalFloodingIssues,

includingfailureoftheJocasseeDam,atOconeeNuclearStation,Units1,2,and3
2008NOV5 ML083390650 11/05/2008MeetingSlides,”OconeeSiteFloodProtection,”NRCMeetingwith
DukeEnergyCarolinas,LLC
2008DEC4 ML091420319 12/04/2008MeetingSummary,MeetingtoDiscussExternalFloodingatOconee
NuclearStation(Reissuance,withErroronPage3Corrected)
2008DEC4 ML090480044 OconeeNuclearStation,ExternalFloodNRRMeeting,Rockville,MD,December4,
2008
2009FEB3 ML090280474 BriefingPackageforCommissionerLyonsVisittoOconeeonFebruary4,2009
2009APR6 ML091170104 OconeeNuclearStation,Units1,2And3NonconcurrenceonEvaluationofDuke
EnergyCarolinas,LLCSeptember26,2008,ResponsetoNuclearRegulatory
CommissionLetterDatedAugust15,2008RelatedtoExternalFlooding
2009APR9 ML091030172 OconeeExternalFloodingBriefingforCommissionerJaczko
2009APR30 ML090570779 OconeeNuclearStationUnits1,2,and3,EvaluationofDukeEnergyCarolinas
September26,2008,ResponsetoExternalFlooding,IncludingFailureofthe
JocasseeDam
2009MAY11 ML092940769 05/11/2009SummaryofClosedMeetingwithDukeEnergyCarolinas,LLC,toDiscuss
PreliminaryResultsoftheRecentInundationandSensitivityStudiesConcerning
FailureoftheJocasseeDamandResultantFloodingatOconeeNuclearStation,1,2,
and3
2009MAY11 ML090820470 5/11/2009NoticeofForthcomingClosedMeetingwithDukeEnergyCarolinas,LLC,
toDiscussSensitivityStudiesConcerningFailureoftheJocasseeDam&Resultant
FloodingattheOconeeNuclearStation,Unit1,2,&3
2009MAY11 ML091380424 OconeeNuclearStation,SlidesforClosingMeetingMay11,2009withDukeonthe
OconeeFloodingIssue
2009MAY20 ML091470265 Oconee,Units1,2&3,RequestforExtensionofDukeResponseTimetoReferenced
Letter
2009MAY26 ML091480116 EmailreBriefingPackageforVisittoJocasseeDamonJune23,2009
2009JUN1 ML091590046 Oconee,Units1,2,and3,RequesttoWithholdSensitiveInformationin
PresentationMaterialsLeftwithStaff
2009JUN10 ML091680195 Oconee,Units1,2,and3Interim30DayResponsetoReference2.

 






 





R
R
R
R
R
R
Enclosure 9 of FOIA Appeal for Requests 2013-0126, 0127 & 0128
Date ADAMS Title
2009JUN11 ML091620669 6/11/09SummaryofClosedMeetingwithDukeCarolinatoDiscussExternal
FloodingatOconee
2009JUN25 ML091760072 NRCSiteVisittotheOconeeNuclearStationonJune15,2009
2009JUL9 ML092020480 Oconee,Units1,2,&3,Final60DayResponsetoReference2
2009JUL28 ML092230608 Oconee,SubmittalofSelectedLicenseeCommitmentsManualSLCRevision
2009AUG12 ML090570117 OconeeFloodProtectionandtheJocasseeDamHazardBasisforNRCAllowing
ContinuedOperation
2009AUG27 ML092380305 Oconee,SlidesforClosedMeetingRegardingExternalFloodTechnicalMeetingOn
August27,2009
2009SEP25 ML092710344 SiteVisitObservationon09/25/2009byJoelMundayforOconee
2009OCT28 ML093080034 10/28/09SlidesforOconeeNuclearStation,Units1,2,and3MeetingSlides
ExternalFloodNRCTechnicalMeeting
2009NOV30 ML093380701 OconeeNuclearStation,Units1,2,and3,OconeeExternalFloodAnalysesand
AssociatedCorrectiveActionPlan
2009DEC4 ML090680737 12/04/09SummaryofClosedMeetingtoDiscusstheDukeEnergyCarolinas,LLC.,
09/26/08ResponsetoNRC’sAugust15,200850.54(f)LetteronExternalFloodingat
Oconee
2010JAN6 ML100280954 01/06/2010BriefingtotheExecutiveTeamontheOconeeNuclearStationExternal
FloodingIssue
2010JAN11 ML100150066 RequestAdditionalInformationRegardingtheOconeeExternalFloodingIssue
2010JAN15 ML100210199 Oconee,Units1,2and3AdditionalInformationRegardingPostulatedExternal
FloodThreatIssues
2010JAN29 ML100271591 EvaluationofDukeEnergyCarolina,LLC(Duke),November30,2009,Responseto
NuclearRegulatoryCommission(NRC)LetterDatedApril30,2009,Relatedto
ExternalFloodingAtOconeeNuclearStation,Units1,2,And3(Oconee)
2010FEB8 ML100470053 Oconee,Units1,2,&3,ExternalFlood,ResponsetoRequestforAdditional
Information
2010FEB26 ML100610674 Oconee,Units1,2,&3,ExternalFloodRevisedCommitmentLetter
2010MAR5 ML103430047 OconeeNuclearStation,Units1,2,&3,LetterFromDukeEnergyCarolinas,LLC
RegardingExternalFlood,ResponsetoRequestForAdditionalInformation
2010MAR15 ML100780084 GenericFailureRateEvaluationforJocasseeDamRiskAnalysis
2010MAR18 ML100810388 PrepareBriefingBookandMaterialforEricLeedsfortheDukeFleetMeetingon
March18,2010
2010APR14 ML100760109 GenericFailureRateEvaluationforJocasseeDam
2010MAY27 ML101600468 Oconee,Units1,2&3,ResponsetoRequestedInformationontheProtection
AgainstExternalFloodingIncludingaPostulatedFailureoftheJocasseeDam
2010JUN1 ML101750619 OUOCommunicationPlanForIssuanceofConfirmatoryActionLetterToDukeFor
OconeeExternalFloodingJune2010
2010JUN3 ML101610083 OconeeNuclearStation,Units1,2,and3,ExternalFloodCommitments
2010JUN22 ML101730329 Oconee,Units1,2&3,ConfirmatoryActionLetter(CAL210003),Commitmentsto
AddressExternalFloodingConcerns
2010JUN29 ML101890803 06/29/2010SummaryofClosedMeetingWithDukeEnergyCarolinas,LLC,to
DiscussExternalFloodingatOconee
2010JUL7 ML101880768 OUOIR0500026910002,0500027010006,0500028710006;01/01/2010
03/31/2010;OconeeNuclearStationUnits1,2and3;InterimCompensatory
MeasuresforExternalFlood
2010JUL19 ML101900305 IdentificationofaGenericExternalFloodingIssueDuetoPotentialDamFailures

 






 






R
R
R
R
R
Enclosure 9 of FOIA Appeal for Requests 2013-0126, 0127 & 0128
Date ADAMS Title
2010AUG2 ML102170006 OconeeUnits1,2,&3,ResponsetoConfirmatoryActionLetter(CAL)210003
2010OCT20 ML102910480 NRCAssessmentofOconeeExternalFloodingIssue(October18,2010)
2010OCT26 ML102990064 NRCStaffAssessmentofDukeEnergyCarolinas,LLC,OconeeExternalFlooding
Issue(TACNOS.ME4441,ME4442,andME4443)
2010NOV29 ML103490330 OconeeNuclearSite,Units1,2,and3,OconeeResponsetoConfirmatoryAction

Letter(CAL)210003
2011JAN5 ML110180609 Enclosure1,OconeeNuclearStation,MajorProjectPlans
2011JAN10 ML110260443 NonconcurrenceonOconeeAssessmentLetter
2011JAN28 ML110280153 StaffAssessmentofDuke’sResponsetoConfirmatoryActionLetterRegarding
Duke’sCommitmentsToAddressExternalFloodingConcernsAtTheOconee
NuclearStation,Units1,2,And3(ONS)(TACNOS.ME3065,ME3066,andME3067)
2011MAR5 ML103410042 SupplementtoTechnicalBasisforAllowingOconeeNuclearStationtoRemainin
OperationThroughNovember2011,AssociatedwiththeExternalFloodingIssues
2011MAR15 ML110740482 AnalysisReportfortheProposedGenericIssueonFloodingofNuclearPowerPlant
SitesFollowingUpstreamDamFailures
2011APR29 ML111460063 OconeeNuclearSite,Units1,2,and3,ResponsetoConfirmatoryActionLetter
(CAL)210003
2011AUG16 ML11229A710 EmailreBriefingPackageforVisittoOconeeNuclearPowerPlantonSeptember12
13,2011
2011AUG18 ML11174A138 OconeeNuclearStation,Units1,2,and3,AssessmentofDukeEnergyCarolinas,LLC

April29,2011,ResponsetoConfirmatoryActionLetterRegardingModificationsto

AddressExternalFloodingConcerns(TACNos.ME6133,ME6134,andME6135)
2011AUG31 ML112430114 ScreeningAnalysisReportfortheProposedGenericIssueonFloodingofNuclear
PowerPlantSitesFollowingUpstreamDamFailures
2011SEP1 ML11244A024 BriefingPackageforVisittoOconeeNuclearPowerPlantonSeptember1213,2011
2011OCT3 ML11278A173 OconeeNuclearStation(ONS),Units1,2,and3,ResponsetoRequestsfor
AdditionalInformationRegardingNecessaryModificationstoEnhancethe
CapabilityoftheONSSitetoWithstandthePostulatedFailureof